How to choose the compressed air supply plan? According to our factories, gas distribution, gas supply pressure rating scale and the factors such as the quality of demand supply of compressed air, after a comprehensive consideration and technical and economic conditions are determined. Let's talk about common gas supply plan:
1, set up regional compressed air station gas supply.
Larger in the factory, the compressed air gas and primary users and is scattered, to reduce the pipe network pressure loss and ensure that focus on the use of gas, commonly used this solution, should have the pipe connected between the regional station, adjust to each other in order to achieve load, as spare.
2, set up several kinds of compressed air station gas supply.
This scheme is mainly used for small and medium-sized factories and gas relatively concentrated large factories.
3, in situ gas supply plan.
Gas when the factory is not big, gas point little and dispersive, can consider to use small air compressor unit with placed near the starting point.
4, the combination of centralized and decentralized supply plan.
In some large and medium-sized factories, the main compressed air gas is relatively concentrated, the secondary scattered. Especially the night less gas, appropriate USES this plan.
5, when the factory have some locations need to supply high quality of compressed air, can consider to separate with a 10 air compressor oil free. Also can consider to use for the concentrate of compressed air, will be treated as part of post-processing equipment later, gas supply, specific use what method, should depend on the size of the gas and gas point position, etc., after comprehensive economic comparison.
6, when the factory needs to supply different compressed air and low pressure gas has large, consideration should be given with different pressure grades of gas supply system, the configuration of different pressure air compressor. To reduce the step-down cause waste of energy, but gas supply pressure classes should not be commonly more than 2, in order to reduce the initial investment of the equipment.
There is a small bit of fu sheng air compressor confidential remind users: if the injection screw air compressor, it does not require special air compressor foundation and station building, also do not need, like a piston type air compressor to full-time operator in monitoring it, so suggest that we should try to avoid fu sheng air compressor adopts centralized gas supply, conveying the habit of long distance gas supply plan, in order to achieve both energy saving and investment, and to ensure that the purpose of the air requirement.